#Honolulu USACE

USACE Public Meeting to Discuss Flood Control Repairs at ʻĪao, Aug. 21

The meetings coincide with the release of the draft environmental assessment and the draft engineering documentation report for the Iao Stream FCP that addresses a severe erosion design deficiency experienced by the existing system.