LIST: Maui Road Closures This Week
Here is a list of lane closures slated for this week, Feb. 15 to Feb. 21.
— HĀNA HIGHWAY (ROUTE 360) —
1) WAILUA VALLEY (24-HOUR WORK)
Lane closure on Hāna Highway (Route 360) in the northbound direction in the vicinity of the Wailua Valley State Wayside on Saturday, Feb. 15, through Friday, Feb. 21, over a 24-hour period, for soil nail installation.
2) HAʻIKŪ (24-HOUR WORK)
Lane closure on Hāna Highway (Route 360) in the northbound direction in the vicinity of Papaʻaʻea Road on Saturday, Feb. 15, through Friday, Feb. 21, over a 24-hour period, for soil nail installation.
3) HAʻIKŪ
Closure of a single lane at a time on Hāna Highway (Route 360) in both directions between Twin Falls and Ulalena Loop on Monday, Feb. 17, through Wednesday, Feb. 19, from 8:30 a.m. to 2:30 p.m., for tree trimming and tree removal. Traffic flow in both directions will be maintained through alternating traffic control (contraflow).
— HONOAPIʻILANI HIGHWAY (ROUTE 30) —
1) LAHAINA
Right lane closure on Honoapiʻilani Highway (Route 30) in both directions between Lahainaluna Road and Aholo Road on Tuesday, Feb. 18, through Wednesday, Feb. 19, from 8:30 a.m. to 2:30 p.m., for landscape maintenance.
2) KAPALUA
Closure of single lane at a time on Honoapiʻilani Highway (Route 30) in both directions in the vicinity of Mile Marker 32, between Honolua Bay Scenic Lookout and Honolua Bay Trailhead on Thursday, Feb. 20, and Friday, Feb. 21, from 8:30 a.m. to 2:30 p.m., for tree trimming and tree removal. Traffic flow in both directions will be maintained through alternating traffic control (contraflow).
— HALEAKALĀ CRATER ROAD (ROUTE 378) —
1) KULA
Right lane closure on Haleakalā Crater Road (Route 378) in the northbound direction in the vicinity of Mile Marker 1.4 on Tuesday, Feb. 18, through Thursday, Feb. 20, from 9 a.m. to 2 p.m., for paving and grading work.
— KĀNE STREET —
1) KAHULUI
Lane shift on Kāne Street in the northbound direction between Vevau Street and Kaʻahumanu Avenue on Tuesday, Feb. 18, through Friday, Feb. 21, from 8:30 a.m. to 3 p.m., for storm drain installation.
— MAIN STREET —
1) WAILUKU
All lanes closed on Main Street in both directions between Church Street and Market Street on Sunday, Feb. 16, from 10 a.m. to 5 p.m., for sewer maintenance work. Motorists will be detoured in both directions. Eastbound detour: Main to Church – Wells Street – and Market back to Main. Westbound detour: Main to Market – Vineyard Street – and Church back to Main.
Lane closure schedules may change at any time without further notice. All projects are weather permitting.